Search results for: 'wall plug'
- Related search terms
- plug 15 100
- plug 15 40
- plug 15
- plug
- plug 15 8
-
Wall bracket set for modular distribution manifold DN 40Components: 2 floor brackets (galvanized steel), 4 wall plugs, 4 screws, 2 screws for fixing the distribution manifold onto the floor brackets
Distance of the pipe axis to the wall: A = 270 mm
Learn MoreOur offer is exclusively aimed at corporate clients.
-
Wall bracket set for modular distribution manifold DN 50Components: 2 floor brackets (galvanized steel), 8 wall plugs, 8 screws, 2 screws for fixing the distribution manifold onto the floor brackets
Distance of the pipe axis to the wall: A = 400 mm
Learn MoreOur offer is exclusively aimed at corporate clients.
-
Wall bracket set for modular distribution manifold - DN 50 (2")Item number: 41652
Components: 2 floor brackets (galvanized steel), 8 wall plugs, 8 screws, 2 screws for fixing the distribution manifold onto the floor brackets
Distance of the pipe axis to the wall: A = 400 mm
Learn MoreOur offer is exclusively aimed at corporate clients.
-
Wall bracket set for modular distribution manifold DN 25-32Components: Mounting equipment
DN 25: Possible wall distance: 150 mm
DN 32: Possible wall distance: 180 mm
For 5-fold modular distribution manifolds, we recommend to use two wall bracket sets. Learn MoreOur offer is exclusively aimed at corporate clients.
-
Wall bracket set for modular distribution manifold DN 25-32Components: Mounting equipment
DN 25: Possible wall distance: 150 mm
DN 32: Possible wall distance: 180 mm
For 5-fold modular distribution manifolds, we recommend to use two wall bracket sets.
Learn MoreOur offer is exclusively aimed at corporate clients.
-
Tank connection group ¾" - GAG/heatingcompletely mounted, consisting of:
1 wall bracket ¾" female thread
1 heating manometer d = 63 mm, 0-4 bars with automatic isolation
1 pressure relief valve ½", 3 bars,
1 automatic air vent ⅜", with automatic isolation
1 tank connector ¾", 2 screws and wall plugs
Learn MoreOur offer is exclusively aimed at corporate clients.
-
Floor bracketComponents: 2 floor brackets (galvanized steel), 4 wall plugs, 4 screws, 2 screws for fixing the distribution manifold onto the floor brackets
Height = adjustable 1050 - 1080 mm, for shortening simply cut off
Learn MoreOur offer is exclusively aimed at corporate clients.
-
PAW Constant temperature controller PKR6Item number : 703601
Easy assembly and disassembly thanks to the smart PAW snap-in mechanism,
with 2 m cable and safety plug,
incl. mounting set for snap-in assembly on the PAW mixing valve and Pt1000 screw-in sensor G¼" for the flow ball valve,
change-over switch for manual / automatic operation
controller settings for direction of rotation, operation mode and nominal temperature can be adjusted at the display
Technical data
Power supply: 230 V - 50 Hz
Power consumption: 3 W
Torque: min. 6 Nm
Setting time 90°: 120 s
Learn MoreOur offer is exclusively aimed at corporate clients.
-
SolarBloC® maxi BasicApplication range:
Low-Flow (= 0.25 l/minute per m² collector surface), up to 125 m² collector surface
High-Flow (= 0.5 l/minute per m² collector surface), up to 80 m² collector surface
Please note: In order to guarantee a trouble-free function it is essential to carry out a hydraulic dimensioning/check. Learn MoreOur offer is exclusively aimed at corporate clients.